Skip to content

City of West 麻豆精选 smooths the way with road rehabilitation program

Work set to begin on sections of Glenrosa and Ogden roads
web1_230524-wek-westlakerd-paving-paving_1
(Black Press file photo)

The City of West 麻豆精选 is gearing up for a smoother ride for drivers with its annual road rehabilitation program.

Construction is expected to begin this week and should be wrapped up by the end of May, barring unforeseen weather delays.

Roads needing repair, often requiring milling and resurfacing, are prioritized.

Upcoming Road Rehabilitation Projects:Glenrosa Road: The stretch from Highway 97 to the Yorkton/Webber roundabout;

Ogden Road: Improvements from Graymar Road to Boucherie Road.

Motorists are asked to obey traffic control signs and personnel instructions, reduce speed in work zones, and give crews plenty of space.

For more information about investments in road infrastructure, visit the City of West 麻豆精选 website.

READ MORE: Shannon Lake, Shannon Way next up for water main flushing in West 麻豆精选

READ MORE: Saving a prominent piece of Peachland鈥檚 history



About the Author: Gary Barnes

Journalist and broadcaster for three decades.
Read more



(or ) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }